Project Highlight:
Townsville Central Park and Stadium Boardwalk

People walking to football match along Millboard boardwalk in Townsville
Photo courtesy of Townsville City Council

Millboard Coppered Oak was the decking of choice for the multi-kilometre boardwalk for the Townsville City Council. The boardwalk runs from Victoria Bridge along the waterfront to Lowths Bridge, leading to the new Stadium. This multi-million dollar boardwalk provides a vital link between the central business district, Palmer Street and Queensland Country Bank Stadium.

Townsville Millboard composite decking boardwalk with bollards

Millboard was chosen for the Townsville boardwalk project due to its high anti slip rating (P5), durability and low maintenance. The boards provided the Townsville City Council with a long term commercial grade solution that is also environmentally friendly. The decking boards are made from up to 40% reclaimed minerals, but they don't contain any timber so unlike wood plastic composites, Millboard keeps the forests where they should be.



Townsville view by the river along the Millboard boardwalk


Coppered Oak | Enhanced Grain

Width 176mm (Wide)
Thickness 32 mm (Thick)
Length 3.6m (Long)
Color Coppered Oak
Accessories DuraFix Screws
Fletcher Street Bridge in Millboard decking Townsville QLD

The project also included the pedestrian bridge over Little Fletcher featuring unique alternating colours of the Millboard Brushed Basalt and Coppered Oak decking. Installation was undertaken by both Wagner and JMac Constructions for different sections of the project.

Talk to us about your project Get in Touch

Copyrights Timber Distributors 2022 | All Rights Reserved